Construction Corner

Updates and Information on Moreland District Construction and Maintenance Projects – Summer Projects 2008

Downloadable pdf

Anderson:

  • Install a new front gate and fencing adjacent to the front office
  • Installation of solar panels on two buildings (Completed May 2008)

Baker:

  • Install a new playground structure and poured-in-place rubber surface
  • Paint the exterior of all buildings, doors, and frames
  • Install two ball walls on playground
  • Add connecting doors between Rooms 17 to 18 and Rooms 19 to 20
  • Installation of solar panels on two buildings (Completed June 2008)

Country Lane:

  • Paint the exterior of all buildings, doors, and frames
  • Slurry seal the blacktop areas and restripe courts
  • Install one ball wall on playground
  • Install a walking track around the field area

Easterbrook Discovery:

  • Construct seven new modular classrooms
    (Completed by August 18, 2008)
  • Convert large activity room and two science rooms into four regular classrooms
  • Install water/sinks/sewer to numerous classrooms
  • Add playground access to restroom
  • Remodel locker room (Includes separate access to restroom from playground and locker room)

Payne:

  • Install two ball walls on playground
  • Add connecting doors between Rooms K-1 to K-2
  • Install a walking track around the field area
  • Slurry seal the blacktop areas and restripe courts
  • Installation of solar panels on two buildings (Completed June 2008)

Moreland Middle:

  • Build a new modular boys/girls locker room
  • Future Construction (Winter 2008 – Fall 2010)
    • Construct new two story library/media center (1st floor – nine classrooms, 2nd floor – Library/Media Center)
    • Convert old library to two classrooms and small conference rooms
    • Upgrade staff room area (Convert small office area to satellite staff room)
    • Upgrade two science rooms (add gas and water)
    • Remove 18 portable classrooms and add 50-space staff parking lot

Community Center:

  • Remove windows and repair wall on south side of gym wall - To Be Determined
  • Paint the exterior of all buildings, doors, and frames - To Be Determined

Challenger School (Strawberry Park School Site):
District approved – Challenger funded projects – Summer 2008

  • Extend and add new concrete walkways and asphalt paving outside classsrooms
  • Add new curb borders to all playground equipment structures
  • Install two new playground structures and curb borders
  • Construct concrete retaining walls to support new planter boxes
  • Revitalize existing sod and extend irrigation system



 

spacerspacerspacer

Construction Man

Tom Kennedy
Facilities and Construction
408.874.2914
email


 

historic moreland photo

Moreland School District
4711 Campbell Avenue
San Jose, CA 95130-1790
Phone: (408) 874-2900
Fax: (408) 374-8827

CONTACT US

spacer
 

© 2007 Moreland School District • 4711 Campbell Avenue, San Jose, CA 95130-1790  |  Phone: (408) 874-2900 • Fax: (408) 374-8827
Website design by www.CreativeGroupDesign.com